§ 117.224. Thames River.
180 words·~1 min read·
/us/cfr/t33/s§ 117.224·A research copy — for the controlling text, always check the official state or federal source. Not legal advice.
The draw of the Amtrak Bridge, mile 3.0, at New London, shall operate as follows:
(a)The draw shall open on signal to 75 feet above mean high water for all vessel traffic unless a full bridge opening to 135.3 feet above mean high water is requested.
(b)The 75 foot opening will be signified by a range light display with one solid green light and one flashing green light and the full 135.3 foot opening will be signified with two solid green range lights.
(c)The draw shall open on signal for public vessels of the United States and commercial vessels; except that, when a train scheduled to cross the bridge without stopping has passed the Midway, Groton, or New London stations and is in motion toward the bridge, the lift span shall not be opened until the train has crossed the bridge.
(d)The draw shall open on signal as soon as practicable for all other vessel traffic but no later than 20 minutes after the signal to open is given. \[USCG-2013-0983, 80 FR 4, Jan. 2, 2015\]
Connections10 cite this
Cited by 10 sections · top 9
register
- UnknownFinal rule
- Rules and RegulationsNotice of temporary deviation from regulations
- UnknownFinal rule
- UnknownFinal rule
- Proposed RulesNotice of proposed rulemaking
- Rules and RegulationsFinal rule
- UnknownAffirmation of interim rule as final rule
- Rules and RegulationsNotice of deviation from drawbridge regulation
- NoticesNotice of deviation from drawbridge regulation; modification
Citation graph
cites case law
§ 117.224
Thames River.
Fed. Reg.×10
Cites 0Cited by 10 across 1 source